Running Safe Kiln Controller against a simulated kiln

The firmware can be run with the kiln process simulated instead of driven, in two places: on a development host, where the host test suite does it, and on the target under QEMU, where you can watch a firing and inject faults from the console.

Both work for the same reason: SWA-01 puts every hardware access behind an interface header in kiln_ports, so the plant substitutes at the port boundary. The code being exercised is the real control and safety path, not a mock of it.


1. Host tests

No ESP-IDF needed. Plain CMake, seconds to build, and the whole suite runs in about four seconds.

cmake -B build-host -S firmware/controller/test/host
cmake --build build-host
ctest --test-dir build-host --output-on-failure

Options, per architecture §14.2:

Option Effect
-DENABLE_ASAN=ON AddressSanitizer and UBSan (SWR-TST-20)
-DENABLE_COVERAGE=ON gcov instrumentation (SWR-TST-19)

A single suite can be run directly, and takes a substring filter:

./build-host/test_safety_current sr27

SWA-02's injected clock is what makes the timings practical: a 168 h firing, a 15 min runaway window and a 30 s fail-off window are all simulated in milliseconds of wall time, because no core function ever reads a clock.


2. On the target, under QEMU

. $IDF_PATH/export.sh
idf.py --preview install-qemu        # once
tools/run-qemu.sh

Or by hand:

cd firmware
export SDKCONFIG_DEFAULTS="sdkconfig.defaults;sdkconfig.qemu"
idf.py set-target esp32s3
idf.py build
idf.py qemu monitor

The firing starts on its own and the console prints a line a second:

[RUN   ]   412.8 degC  sp   415.0  rate  +178.3 degC/h  duty  612  I 24.81 A C     ref 29.95  seg 2/5  HEAT  [contactor closed]

The I column is the gated current measurement and the letter after it is the flag that says what the measurement means (SWR-CUR-04): C conduction, L leakage, S skipped because the window was too short, ~ stale, ! transformer fault. Without that flag a reading of 0.00 A is uninterpretable, which is why SWA-18 put it in the log record too.

Keys

s a p r start, abort, pause, resume
c m i clear the latched fault, manual 50 %, idle
R l list stored run records, erase the sample log
h help

Fault injection, each toggling:

0 and d are deliberately separate. 0 is the plant, an open lid losing heat, which is what SWR-SAF-07 infers from duty and rate of rise. d is the interlock switch. Keeping them apart is what lets you exercise a switch that has failed open on a shut door, or a genuinely open door on a kiln with no interlock. A realistic "operator opened the door" is both at once.

Key Injection Rule it exercises
1 Relay fail-on, current with heating commanded off SWR-SAF-25, then SWR-SAF-27
2 Relay fail-off, no current with heating commanded on SWR-SAF-26
3 Welded contactor, current persists after the contactor opens SWR-SAF-27
4 Partial element loss, one group of three SWR-SAF-28
5 Over-current SWR-SAF-29
6 Current transformer disconnected SWR-CUR-11, SWR-CUR-12
7 SSR shorted SWR-SAF-08 and SWR-SAF-25 together
8 Thermocouple open SWR-SAF-04
9 Thermocouple stuck SWR-SAF-06
0 Lid opened mid-firing, the thermal model: heat loss, no switch SWR-SAF-07
d Door interlock switch reads open SWR-SAF-31
D No door interlock fitted warning 113
x Clear every injection

Try 3 then 7 together during a firing: the contactor is welded shut and the SSR is passing current, so SWR-SAF-25 sees current in an off-window, withholds heat, opens the contactor, and the current does not stop. That is the discrimination sequence of SWR-SAF-27, and it latches fault 22 with the instruction to isolate the kiln at its supply. Press 7 alone and the same symptom resolves to fault 21: the contactor opened, so it is only the SSR that has failed.

Time acceleration

A kiln's time constant is tens of minutes, so CONFIG_KILN_SIM_TIME_ACCEL (default 60) multiplies both the plant integration and the dt handed to the acquisition, control and safety cycles, keeping the two consistent. A four-hour schedule completes in about four minutes.

The 10 ms output window and the current-measurement settle and burst timings are deliberately not accelerated, those are real hardware timings, and leaving them real is what makes the gating of SWA-17 meaningful here.


3. What QEMU does and does not prove

QEMU's esp32s3 model provides a CPU, memory, flash and a UART. It does not model a MAX31856 on SPI, an SSD1306 on I²C, the ADC, or PCNT, so there is nothing for a thermocouple driver to talk to and nothing for the CT front end to sample. Substituting the plant at the port boundary is what makes the exercise possible at all.

Exercised: the task structure and its periods, the real kiln_core logic end to end against a plant that responds, the state machine, the window and current-gating timing, every fault injection, all on the target's own compiler, scheduler and single-precision FPU.

Storage is not simulated. QEMU emulates the flash, so NVS, the kilnlog partition and the kilnfs file store are all real: the configuration persists, the sample log is a real ring on real sectors, programs and run records survive a reboot, and SWR-SAF-17's latched fault survives a restart. Press R to list stored run records and l to erase the log and watch the ring start over. The simulated firmware runs exactly the store the board runs (SWA-21), so a program saved under QEMU is still there after a reset.

Not exercised: the device drivers; the charge-pump release of SWA-05, which is the central safety property of the design and can only be verified by halting the safety task on real hardware (SWR-TST-17, SYS-SAF-02); flash endurance; WiFi; and anything else that needs a pin. Those are target and HIL work.

The simulator does model the charge pump as a decay timeout, so the firmware's side of the property, that nothing refreshes the pump when the safety task stops, and the contactor releases, is tested (swa05_a_stopped_safety_cycle_releases_the_contactor in the integration suite). Whether the real circuit reaches the contactor's drop-out voltage inside SWR-NFR-04's one second is a question about resistors, and is open as tasklist item A7.

Never flash a CONFIG_KILN_PLANT_SIM build to a kiln. The SSR and contactor outputs are not driven at all, and the temperatures on the display are invented.