You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Commit f033546
Browse filesBrowse the repository at this point in the historyBrowse files
TASK-053 step 6: mark task complete in deferred-backlog plan
Flip TASK-053 to Status: Done and check off the six action
items with one-line pointers to the corresponding commit
(steps 1-5 and the rename done as part of step 3). The
action-item descriptions are updated to match what actually
landed: the v1 fallback was retired in step 3 alongside the
LRU rename, the v1 registration maps (registered_resources*)
survive as non-dispatch bookkeeping for the lambda-shim and
WebSocket paths (their removal is its own follow-up), and the
bench-targets line carries bench_route_lookup as added in
step 5.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
0 commit comments