Skip to content

chore(loom): resync installed Loom to v0.19.1263 - #258

Merged
rjwalters merged 1 commit into
mainfrom
chore/loom-resync-v0.19.1263
Nov 5, 2026
Merged

rjwalters merged 1 commit into
mainfrom
chore/loom-resync-v0.19.1263

Conversation

@loom-fleet-dispatch

@loom-fleet-dispatch loom-fleet-dispatch Bot commented Nov 4, 2026 •

Copy link
Copy Markdown
Contributor

Loom-Resync-Host: loom-worker-3
Loom-Resync-Version: 0.19.1263

The default branch refused a direct push (error: GH006: Protected branch update failed for refs/heads/main.), so the resync is proposed here.

Loom-Resync-Host: loom-worker-3
Loom-Resync-Version: 0.19.1263
@loom-fleet-dispatch loom-fleet-dispatch Bot added the loom:review-requested PR ready for Judge to review. Applied by: Builder when opening PR. label Nov 4, 2026
@loom-fleet-dispatch

loom-fleet-dispatch Bot commented Nov 4, 2026 •

Copy link
Copy Markdown
Contributor Author

PR #258's loom:reviewing claim is held by the judge of sweep step-judge-258-1793833631 on host host-d0749b00. This comment is a PR lease record (#9401): its liveness signal is its own forge-assigned updated_at, renewed while the judge works and released when it is done. Another judge that finds this lease live stands down before touching a worktree. See defaults/docs/lease-record.md § "PR-phase leases".

@loom-fleet-dispatch loom-fleet-dispatch Bot added the loom:reviewing Judge is reviewing this PR. Applied by: Judge only. Stale after LOOM_STALE_REVIEWING_MINUTES (30m). label Nov 4, 2026
@loom-fleet-dispatch

Copy link
Copy Markdown
Contributor Author

✅ Approved! Loom resync 0.19.1259 → 0.19.1263. Diff (34 files) is confined to installed-Loom paths (.agents, .claude/commands/loom, .loom/*, .gitignore); install-metadata version/commit/installed_files are consistent with the added files (2 new tests + spawn-gemini.sh). The .gitignore change anchors /.loom-local/. CI green at this head (wait-checks: LOOM-CHECKS-GREEN), merge state CLEAN, no formal reviews/inline threads (check-review-feedback: CLEAR). Did not line-review upstream Loom content.

loom dashboard

@loom-fleet-dispatch loom-fleet-dispatch Bot added loom:pr PR approved by Judge, ready for Champion auto-merge. Applied by: Judge. and removed loom:review-requested PR ready for Judge to review. Applied by: Builder when opening PR. loom:reviewing Judge is reviewing this PR. Applied by: Judge only. Stale after LOOM_STALE_REVIEWING_MINUTES (30m). labels Nov 4, 2026
@loom-fleet-dispatch

loom-fleet-dispatch Bot commented Nov 4, 2026 •

Copy link
Copy Markdown
Contributor Author

PR #258's (no label: the lease is the claim) claim is held by the champion of sweep step-champion_merge-258-1793833775 on host host-d0749b00. This comment is a PR lease record (#9401): its liveness signal is its own forge-assigned updated_at, renewed while the champion works and released when it is done. Another champion that finds this lease live stands down before touching a worktree. See defaults/docs/lease-record.md § "PR-phase leases".

@loom-fleet-dispatch

Copy link
Copy Markdown
Contributor Author

Champion: Holding for Human Merge

Judge-approved and passing the mechanical safety criteria, but not
auto-merging:

  • Blast radius / revertability (kept set: the merge gate itself): this resync rewrites .loom/scripts/merge-pr.sh, .claude/commands/loom/champion-pr-merge.md, champion-critical-file-hold.md, champion-reference.md, judge.md (and its role/skill copies), and .loom/scripts/check-main-clean.sh/spawn-gemini.sh. These are merge-gate paths. The resync waiver (#13096) excludes them (RESYNC_GATE_PATTERNS: *champion*, *judge*, *merge-pr.sh), because the gate cannot vouch for a change to itself. .gitignore is also outside the waiver's install set.

Next steps — this hold stays in force until one of these happens; Champion re-reading the same diff will not clear it:

  • A human releases it: gh pr edit 258 --remove-label "loom:blocked". Champion merges on its next tick unless it finds a concern this notice does not name; or run ./.loom/scripts/merge-pr.sh 258 yourself after removing it (merge-pr.sh refuses loom:pr + loom:blocked together, #8112)
  • Or applies loom:auto-merge-ok to override the hold; Champion merges on the next tick
  • Or comments here to clear it explicitly — start the comment with the instruction: clear the hold — <why>
  • Or the situation actually changes: a new push that narrows the concern, or a deeper Judge re-review

Whichever path releases it, Champion will post a comment naming what changed before it merges.

Keeping loom:pr. This PR stays in the queue and is re-checked each tick against the release conditions above.


Automated by Champion role

loom dashboard

@loom-fleet-dispatch loom-fleet-dispatch Bot added the loom:blocked Waiting on something named (another change, a capability); released once it resolves label Nov 4, 2026
@rjwalters

Copy link
Copy Markdown
Member

clear the hold — the operator released this Loom v0.19.1263 resync in the attended /fleet:decide session (2am-3e, round 20261105-r6 q1, 2026-11-05), same ruling as the v1259 batch (r5-q66). Held head 06a49e5 re-checked: Judge-approved, CI green. The gate files are upstream rjwalters/loom content at the pinned release. Merging with this repo's merge-pr.sh.

@rjwalters rjwalters removed the loom:blocked Waiting on something named (another change, a capability); released once it resolves label Nov 5, 2026
@rjwalters
rjwalters merged commit 556640c into main Nov 5, 2026
7 checks passed
@rjwalters
rjwalters deleted the chore/loom-resync-v0.19.1263 branch November 5, 2026 06:17
@loom-fleet-dispatch

loom-fleet-dispatch Bot commented Nov 5, 2026 •

Copy link
Copy Markdown
Contributor Author

PR #258's (no label: the lease is the claim) claim is held by the champion of sweep step-champion_merge-258-1793859454 on host host-7ec0fa4c. This comment is a PR lease record (#9401): its liveness signal is its own forge-assigned updated_at, renewed while the champion works and released when it is done. Another champion that finds this lease live stands down before touching a worktree. See defaults/docs/lease-record.md § "PR-phase leases".

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

loom:pr PR approved by Judge, ready for Champion auto-merge. Applied by: Judge.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant