Outcome / 目标
验收先观测后治理的长程可靠性诊断。One task tracks this RFC's delivery; keep implementation PRs and milestone evidence here instead of creating a parallel task tree.
Canonical design: RFC. Roadmap: S10/S11/S13, under #4574. Design acceptance is distinct from implementation, live qualification and promotion.
Current boundary
Source audit: main at ce3862e33 (2026-09-28). This is source/PR inspection, not a new test or live-qualification claim.
The default-off reliability-diagnostics prototype and dsh-session-events adapter ship. The capability README explicitly withholds P0 exit pending C0/C1 and measured overhead; the RFC also requires retention/deletion policy.
Work remaining
- Close P0’s integrity, non-interference, retention and real-observer evidence, then assess the P1 diagnostic pilot against a declared outcome.
- Progress to a governed seam or repeatable deployment only through the RFC’s own evidence and authority gates; retain an explicit stop/no-uplift option.
Ownership and ongoing work
Coordinate with the DSH/Pi evidence tracker and #3243 to run each experiment once. Public/synthetic adapter work is available; live cases, provider promotion and external deployment need their existing scoped authorization.
Contribution route: available for a bounded proposal/PR within this RFC. Name the intended milestone and exact files in a claim comment so simultaneous contributors do not duplicate work.
Acceptance
Starting points and delivery boundary
Base: latest main. Reuse the existing typed owner and provider boundaries. Include affected CLI/frontend/Lark companions; verify real entrypoints and backend where changed. Preserve existing first-screen review and maintainer merge gates. Public artifacts contain only synthetic/public-safe evidence, no private operational state. This task does not authorize provider promotion, benchmark launches, release/deployment or unrelated protected effects.
Outcome / 目标
验收先观测后治理的长程可靠性诊断。One task tracks this RFC's delivery; keep implementation PRs and milestone evidence here instead of creating a parallel task tree.
Canonical design: RFC. Roadmap: S10/S11/S13, under #4574. Design acceptance is distinct from implementation, live qualification and promotion.
Current boundary
Source audit:
mainatce3862e33(2026-09-28). This is source/PR inspection, not a new test or live-qualification claim.The default-off reliability-diagnostics prototype and dsh-session-events adapter ship. The capability README explicitly withholds P0 exit pending C0/C1 and measured overhead; the RFC also requires retention/deletion policy.
Work remaining
Ownership and ongoing work
Coordinate with the DSH/Pi evidence tracker and #3243 to run each experiment once. Public/synthetic adapter work is available; live cases, provider promotion and external deployment need their existing scoped authorization.
Contribution route: available for a bounded proposal/PR within this RFC. Name the intended milestone and exact files in a claim comment so simultaneous contributors do not duplicate work.
Acceptance
Starting points and delivery boundary
Base: latest
main. Reuse the existing typed owner and provider boundaries. Include affected CLI/frontend/Lark companions; verify real entrypoints and backend where changed. Preserve existing first-screen review and maintainer merge gates. Public artifacts contain only synthetic/public-safe evidence, no private operational state. This task does not authorize provider promotion, benchmark launches, release/deployment or unrelated protected effects.