Skip to content

workflows: postpone wrynose daily build - #3194

Merged
quic-yocto-ci merged 1 commit into
qualcomm-linux:masterfrom
mwasilew:workflows/reschedule-wrynose-builds
Sep 29, 2026
Merged

quic-yocto-ci merged 1 commit into
qualcomm-linux:masterfrom
mwasilew:workflows/reschedule-wrynose-builds

Conversation

@mwasilew

Copy link
Copy Markdown
Contributor

Push wrynose daily build to start 2h after scheduled master build. This should spread test jobs so the LAB can cope with the load.

Push wrynose daily build to start 2h after scheduled master build. This
should spread test jobs so the LAB can cope with the load.

Signed-off-by: Milosz Wasilewski <milosz.wasilewski@oss.qualcomm.com>
@mwasilew
Milosz Wasilewski (mwasilew) force-pushed the workflows/reschedule-wrynose-builds branch from 2e73955 to 168f06f Compare September 18, 2026 14:32

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

LGTM, marking as request for changes to avoid getting this merged with another user, will merge with quic-yocto-ci.

@mwasilew

Copy link
Copy Markdown
Contributor Author

Do I need to do anything about it?

@github-actions

Copy link
Copy Markdown

Test run workflow

Test jobs for commit 168f06f

qcom-distro
Pass: 329 | Fail: 2 | Total: 357
qcom-distro_linux-qcom-6.18
Pass: 228 | Fail: 6 | Total: 259
nodistro
Pass: 10 | Fail: 0 | Total: 10

@test-reporting-app

Copy link
Copy Markdown

Test Results

  119 files  +   51    715 suites  +396   7h 9m 44s ⏱️ + 2h 36m 46s
  173 tests +   22    159 ✅ +   16   2 💤  -  1  12 ❌ + 7 
4 607 runs  +2 506  4 541 ✅ +2 472  51 💤 +24  15 ❌ +10 

For more details on these failures, see this check.

Results for commit 168f06f. ± Comparison against base commit f497678.

This pull request removes 2 and adds 24 tests. Note that renamed tests count towards both.
lava ‑ auto-login-action
lava ‑ minimal-boot
10_Logging_Journalctl_Validation ‑ Logging_Journalctl_Validation
11_Partition_PostBoot_Validation ‑ Partition_PostBoot_Validation
12_Boot_Systemd_KPI_Loop ‑ Boot_Systemd_KPI_Loop
5_OpenCV ‑ OpenCV
6_Ethernet ‑ Ethernet
6_irq ‑ irq
7_BT_ON_OFF ‑ BT_ON_OFF
7_Docker_Kernel_Config ‑ Docker_Kernel_Config
8_AudioRecord ‑ AudioRecord
8_EFI_Variable_Validation ‑ EFI_Variable_Validation
…

@qcomlnxci

Copy link
Copy Markdown

Test Coral run workflow

Test jobs for commit 168f06f

  • qcomdistro: multimedia image
    Pass: 9 | Fail: 0 | Total: 9
  • qcomdistro: multimedia image-prop
    Pass: 26 | Fail: 0 | Total: 26

@lumag

Copy link
Copy Markdown
Contributor

Do I need to do anything about it?

No.

@ricardosalveti

Copy link
Copy Markdown
Contributor

I will take care of the merge.

@quic-yocto-ci
quic-yocto-ci merged commit 933e223 into qualcomm-linux:master Sep 29, 2026
209 of 211 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

5 participants