native real-control/PostgreSQL/two-relay race integration passed on this tree: ten carrier-loss cases in 118.31s plus live claim renewal in 57.53s (177.473s package). one target survived the original pair deadline; both relay claims advanced by at least 30.021s. the disposable Linux authoritative-DNS target also exited successfully, without changing its ten-second split-relay readiness budget. this does not resolve #470 qualification: its unchanged composed full run passed API and all four state shards, then failed runtime shard 1 at |
|
CI at |
|
parent qualification receipt: #470 unchanged |
What
Reconcile the Go and npm dependency updates with the coordinated transport branch, without raising the SDK's Node minimum or undoing its HTML-parser security fix. Stacked on #470; the compatible changes from #457 and #459 are applied here rather than merging either older branch.
Why
The transport work already requires x/net v0.62.0 and its dependency minimums. The Go dependency update needs to preserve that floor and account for the separate disposable-test-harness module.
The npm update also includes two majors that require Node 22.19: Undici 8 and ref-parser 16. The SDK currently supports Node 22.18, so those two updates remain deferred rather than silently changing its runtime requirement.
Qualification also exposed a publisher-policy response at its exact request deadline before the context timer had closed
Done. A separate fix commit checks the absolute deadline, so timer scheduling cannot issue expired preparation work or install its late response.Changes