Reconcile the Go and npm dependency updates with the coordinated transport branch, without raising the SDK's Node minimum or undoing its HTML-parser security fix. Stacked on #470; the compatible changes from #457 and #459 are applied here rather than merging either older branch.

Why

The transport work already requires x/net v0.62.0 and its dependency minimums. The Go dependency update needs to preserve that floor and account for the separate disposable-test-harness module.

The npm update also includes two majors that require Node 22.19: Undici 8 and ref-parser 16. The SDK currently supports Node 22.18, so those two updates remain deferred rather than silently changing its runtime requirement.

Qualification also exposed a publisher-policy response at its exact request deadline before the context timer had closed Done. A separate fix commit checks the absolute deadline, so timer scheduling cannot issue expired preparation work or install its late response.

Changes

  • Update the compatible AWS, Prometheus, OTLP, and transitive Go dependencies in the root and test harness, retaining the x/net security floor.
  • Apply ten compatible npm updates; retain Undici 7, ref-parser 14, and the existing Node engine declarations.
  • Regenerate the embedded feedback toolbar with the updated Preact dependency.
  • Fence policy preparation before control work and response installation, with deterministic delayed-timer regressions and no credential or application retry.

@0xcadams

Copy link
Copy Markdown
Member Author

local receipts at signed adea3af9: frozen pnpm install, JavaScript build/type checks, 35 files / 286 tests, JS lint/format, package verification, Chrome toolbar check, routine Go/public API, full Go races, harness races, Go lint, full formatting, diff checks, and post-commit generation verification passed. govulncheck reports zero reachable vulnerabilities; one uncalled advisory remains in required modules.

f8179ad7 is the separate policy-deadline fix: both new delayed-timer cases fail before it (expired fetch issued a call and installed an observation; late response also installed) and pass afterward. ten focused race repetitions and the broader visitor-policy race tier passed. the first full race run caught the original exact-deadline assertion; no blanket retry or timeout increase was used to fix it.

real-control native packet/claim-renewal integration is running on this tree. #470’s composed full integration run remains on its unchanged cde60284 tree. current-tip CI is not claimed green. no merge, release/version/tag operation, deployment, live infrastructure change, or deployed benchmark.

@0xcadams

Copy link
Copy Markdown
Member Author

native real-control/PostgreSQL/two-relay race integration passed on this tree: ten carrier-loss cases in 118.31s plus live claim renewal in 57.53s (177.473s package). one target survived the original pair deadline; both relay claims advanced by at least 30.021s. the disposable Linux authoritative-DNS target also exited successfully, without changing its ten-second split-relay readiness budget.

this does not resolve #470 qualification: its unchanged composed full run passed API and all four state shards, then failed runtime shard 1 at TestIntegrationControlRestartPreservesDataPlane with EOF on the fresh visitor while control was stopped. remaining groups were not reached. that failure is being inspected separately; no complete integration or green-CI claim.

@0xcadams

Copy link
Copy Markdown
Member Author

CI at adea3af9: all PostgreSQL API/state/runtime shards and lease/workload proofs, DNS integration, Runtime workloads, and aggregate Load tests passed. the integration aggregate is still red because Binary (binary) failed in TestBinaryIntegrationManualComposePublisherPublicHTTPAndPostgres: the Compose database publisher emitted TNL_CLIENT_SERVER_RESPONSE_INVALID before ready; the disposable standalone server logged permission API internal failures and exited during control/lease timeouts. other binary tests passed. saved logs need diagnosis; this is not yet classified as a dependency regression or infrastructure flake. no blanket retry, timeout extension, or green-CI claim.

@0xcadams

Copy link
Copy Markdown
Member Author

parent qualification receipt: #470 unchanged 61033ba5 completed all four sequential local race runtime shards and both real-clock lease/workload proofs successfully. these are parent receipts, not additional runs at adea3af9. #470 CI is now complete with only the known Go (Linux) exact-deadline failure; its fix remains the separate f8179ad7 commit here. the earlier local control-outage EOF is still unexplained, and this branch’s binary manual-Compose CI failure still needs diagnosis. no all-green or final-cutover claim.

This branch has not been deployed

No deployments
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant