Skip to content

Continue forward coastal runway and keep 200 m clear of shallow water - #8

Merged
woensug-choi merged 2 commits into
mainfrom
codex/continuous-coastal-routing
Oct 13, 2026
Merged

woensug-choi merged 2 commits into
mainfrom
codex/continuous-coastal-routing

Conversation

@woensug-choi

Copy link
Copy Markdown
Contributor

Coastal renewal now starts at the checked runway endpoint and retains remaining forward bends, preventing a new coast-entry search from sending the vehicle back toward an already passed bay.

Use a 320 m preferred distance, 80 m closer than 400 m. Treat water shallower than 2 m as a shoreline boundary and reserve a 200 m exclusion footprint. A vessel already inside the margin follows a bounded hull-safe outward exit with increasing separation. Existing plans with the smaller buffer require rechecking.

Validation: all 94 component tests pass, including shelf exclusion, outward departure, completed-result handling, and endpoint continuation. The live coordinator retains the same Gazebo world and visit history. WWW-POSIM also rechecks the actual resident pilot corridor before approving thrust.

@woensug-choi
woensug-choi merged commit a960032 into main Oct 13, 2026
2 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant