Repository navigation
Description
Delivery bundle: D: HA and secure deployment. See #395 and #368 for the four-PR stack.
Parent: #392
Roadmap: #368
Plan item: PR-19
Priority: P3
Dependencies: PR-06, PR-07, PR-16
Kubernetes support: Rolling upstream-maintained minors; use the oldest/newest boundaries pinned in config/kubernetes-versions.env. See #368 for the current policy. Unrun jobs are not passed validation.
Problem Statement
Evidence: EnableWarmup is available but not configured; chart default is one replica.
Proposed Solution
Files: main.go or controller options, Helm values/schema if exposing a switch, HA tests and performance documentation.
Interface contract: Warmup starts sources on standbys, not mutation workers. Keep single-replica defaults unchanged unless evidence justifies a change.
- Measure cold failover versus warmup with at least two replicas using the PR-07 workload and PR-16 readiness.
- Test that a standby warms caches but never executes leader-only mutations.
- Record failover improvement and added standby RSS/watch/API cost; agree on an operational budget before enabling by default.
- Merge an opt-in implementation only if the measured benefit justifies the cost; otherwise close the experiment with evidence.
- Validate controller tests and repeated leader-termination Kind trials.
Done when: The issue records an evidence-based adopt/defer decision, not an unmeasured tuning flag.
Delivery: Four consolidated PRs, approved November 16, 2026: A -> B -> C; D branches from A. Foundation is #395. The 22 PR-XX identifiers are work-item IDs, not separate PRs. Preserve every work-item acceptance criterion and native dependency. No gated experiment is automatically enabled, and no issue is complete merely because one PR references it. D must satisfy its native #375 gate, including lifecycle-domain signals assigned to B; branching from A does not waive that merge prerequisite. Write focused regression tests first; record exact commands/results and run make check plus this issue's real-cluster/measurement gates.
Alternatives Considered
Twenty-two individual PRs add unnecessary integration overhead, while one omnibus PR obscures correctness and rollout boundaries. Deliver this scope in its approved dependency-aligned bundle. Do not expand into deferred consistency, storage, or concurrency changes without their own decision gates.
Additional Context
Baseline: 95138e0d; detailed roadmap scope: #368, section PR-19. The roadmap #368 and its native sub-issues are the planning source of truth. No planning document is committed in the final PR diffs. Re-read affected source and overlapping work before implementation. Historical baseline test passes are not validation of this change.
Activity
amuraru commentedon Nov 17, 2026
Warmup is removed from active scope under #368: no measured failover problem justifies an experiment or new switch. Existing-mode HA correctness remains in #392. No warmup implementation claimed.